CompositeLayer-svg

Case Studies

Emergency Boiler Installation for Accommodation Block


The challenge

The customer contacted Cross Rental Services looking for an air purification solution for a parents evening taking place in a school hall. The school supplied the room measurements and details of how many parents were expected to attend at any one time, and our team carried out a free site survey – allowing us to assess which units and how many would be needed for the room.

The solution

  • After the site survey, we determined that two TAC V+ units would best suit this event.
  • With parents arriving and leaving throughout the evening the TACV+ unit provides constant air pollution control and virus filtration in areas with high volume of traffic.
  • Simple operation and fully automatic with no installation effort. The client would just need to “plug in and go”.
  • The units were dispersed around the area in order to provide even air filtration and purification for the parents evening attendees and the school staff.

The outcome

The two TAC V+ air filtration units were on hire for a week providing clean and safe air for two busy nights of parent/teacher meetings. Our client was able to reassure guests of a safe environment allowing all involved to concentrate on their pupils and children.

We were able to fulfil our clients needs within 48 hours from initial enquiry to installation.

Gallery

Overview

Get in touch

See how our HVAC hire solutions
could work for your heating and
cooling requirements.

Related case studies

Sorry, we couldn't find any posts. Please try a different search.