Case Studies

Emergency 1.2MW Boiler Provided For Laboratory


The challenge

  • After being let down by another hire company, a client contacted Cross Rental Services looking for an emergency boiler hire solution to provide heating for the laboratory facility on site.
  • Due to the local proximity of the company to Cross Rental Services, a site survey was organised the next morning.

The solution

  • After viewing the site, our engineer specified that a 1.2MW boiler would be needed to provide heating for the laboratory.
  • An oil solution was provided using two 2000 litre fuel tanks & connected to the heating system using 24 metres of 3” Storz hoses
  • Within 48 hours of first contact, Cross Rental Services had delivered & installed the boiler in accordance with health & safety regulations.

The outcome

The Client was impressed by the prompt solution Cross Rental Services provided. A flexible fuel management service was put in place so the client could receive fuel on demand.

Gallery

Overview

Get in touch

See how our HVAC hire solutions could work for your heating and cooling requirements.