Office Cooling Supported Through Chiller Hire


The challenge

  • After a client’s existing chiller system on site had failed Cross Rental Services was contacted to provide a temporary chiller hire solution while the chiller was being replaced.

The solution

  • The Cross Rental Services team examined the site to propose a solution of one 250kW Chiller.
  • The Chiller used on site was brand new & part of a range of chillers recently added to the Cross Rental Services chiller fleet.
  • Having the temporary chiller installed helped ensure that there was no disruption whilst the chiller on site was being replaced.

The outcome

An air conditioning solution was provided for the client just in time for the start of summer. The 250kW chiller is set to be on site for 6 weeks.