Supporting Heating & Hot Water Services through Planned Boiler Hire

The Challenge

  • The client's site contained 4 boilers. Of these, 3 had failed meaning the final boiler was not able to keep up with demand.
  • Heating the site was essential due to the area consisting of assisted living flats where the residents would be particularly susceptible to the incoming cold snap.

Cross Rental Services' solution

  • The client required a 300kW boiler & made use of the existing boiler fittings to provide 2" stabbings for the temporary boiler.
  • Cross Rental Services' experienced engineer found on a site survey that a lorry would be unable to fit through a narrow gate on the site. Therefore, it was decided that a forklift would be necessary to position the temporary boiler.
  • The boiler was tactically positioned outside of the existing boiler house so that only 4 lengths of 2" Storz hose were required. Meanwhile, the client removed their old boilers & replaced them with new wall hung condensing boilers.

The Outcome

The boiler will be running off diesel 24 hours a day to provide heating & hot water to the 41 assisted living flats. The temporary 300kW boiler will be on site for 4 weeks.

  • Emergency survey & installation to support minimal client disruption
  • All actions complied with Cross’ standard operating procedures & adhered to all health & safety regulations.
  • Full fuel management for total peace of mind
  • Back to business with temporary heating & hot water for a client in need

Boiler Range

Electric Boiler Hire

22kW Electric Boiler

View Details
100kW Boiler

100kW Boiler

View Details
300kW Boiler

250kW Boiler

View Details
300kW Boiler

300kW Boiler

View Details
500kW Boiler

500kW Boiler

View Details
600kW Boiler

600kW Boiler

View Details
1.2MW Boiler

1200kW Boiler

View Details
1.2MW Boiler

1200kW Boiler – Dual Fuel

View Details