Large Scale Heating Solution For A Sensitive Public Sector Site
Large Scale Heating Solution For A Sensitive Public Sector Site

The Challenge

  • Heating solutions often require a consideration for noise levels & emissions management – particularly in public sector environments. Cross Rental Services provide a TOTAL managed service to incorporate every customer consideration.
  • In this instance Cross were asked to heat a 70,000 metre squared building, with a carefully managed solution incorporating shift patterns, fume extraction & decibel level management – in addition to the heating solution

Cross Rental Services’ solution

  • Cross Rental Services first undertook an in depth site survey through our team of expert engineers
  • On specification we subsequently installed an externally placed 600kW containerised boiler, connected internally to 4 x 200 kW air handling units, via flexible boiler hose with quick coupler connections, time clock linked & controlled via thermostat – for full temperature control
  • Air handling units were positioned on scaffold platforms, protected by barriers for site safety & sound management
  • Fume extraction was delivered through 8 independent extraction systems & a ducting network

The Outcome

Meticulous planning & expertise gave our important customer the solution they required & guaranteed this public sector customer full heating with no unwanted compromise
Monthly planned preventative service & full fuel management ensured that the site ran smoothly for the duration of the 36 month hire

Overview

  • Fully specified solution via our team of qualified engineers
  • Bespoke solution to accommodate extraction & sound management
  • Fully maintained & fuel managed for long term peace of mind
  • Back to business for a large scale & sensitive public sector site for a long term hire