Long term hire of a temporary boiler plant supporting a large building complex for a leading tertiary education institution.
Specification of a custom-built package required due to complications of the existing heating system.
Additional complications due to the presence of asbestos in the original installation.
The Solution
Three 600kW gas fired boilers supplied. Giving resilience to breakdown and significantly reducing the likelihood of a total loss of services.
Bespoke containerised pump and control house designed and manufactured. Specified to provide separate variable temperature and constant temperature circuits.
Fully managed by technical projects team, from specification through design & installation.
On site servicing completed at regular intervals, keeping the systems running at highly efficient levels.
The Outcome
Close cooperation with the building services design practice ensured effective specification of the bespoke boiler package.
Communication with all involved parties meant that the temporary equipment requirements were continually assessed as the project progressed.
Temporary plant in place for duration of asbestos abatement removal programme and boiler room refurbishment.